31

Jul

Large space multi-station continuous lifting furnace
Customized by the famous Aerospace Materials Research Institute. 
Time is tight, task is heavy! SAFTHERM worker spent 50 days and nights.
the design drawings are 66cm high, 
the steel consumption is 11 tons, and the high temperature materials are 3 tons...
"Large space multi-station continuous lifting furnace" was successfully commissioned at one time